Nortel-networks Nortel Backbone Link Node Router 5030 Instrukcja Użytkownika Strona 8

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 12
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 7
97-15251
Lever
Closure
Screw
8
3. Locate the T1/R1 connectors on the customer premises side of the punchdown
block or NID where the existing POTS wiring was removed in Step 3 on page 6.
Attach the jumper pair from P1/P2 labeled LINE in the POTS splitter to the T1/R1
connectors.
DSL/POTS
From Local
Loop
Wiring to
DSL Jack
Telephone Network Interface Device (NID)
Ground
Tip
T1
(Green)
97-15341
Jumper Wiring to
POTS Splitter
for POTS
Demarcation PointCustomer Premises
Ring
R1
(Red)
4. Snap the lever shut to
close the POTS splitter.
5. Use the 3/8 nut driver
on the closure screw to
securely close the housing.
Przeglądanie stron 7
1 2 3 4 5 6 7 8 9 10 11 12

Komentarze do niniejszej Instrukcji

Brak uwag